© SYBILLA Consulting Engineers Ltd.
SYBILLA Consulting Engineers Ltd.
WORK REFERENCE
A. SAFETY/RISK STUDIES (SEVESO I , II & III, QRA, HAZID/HAZOP/WHIF) : 1. Hazard Identification (HAZID/WHIF) study for the CYANAMID HELLAS S.A (Now BASF) installation in Thessaloniki. 1995 2. Safety Report/QRA (Seveso Directive) for the CYANAMID HELLAS S.A (Now BASF) installation in Thessaloniki. 1995 3. Hazard Identification (HAZID/WHIF) study for the LAPAPHARM S.A installation in Mandra, Athens. 1996 4. Safety Report/QRA (Seveso Directive) for the LAPAPHARM S.A installation in Mandra, Athens. 1996 5. Hazard Identification (HAZID/HAZOP) study for the KRASSAS S.A LPG installation in Mesologgi. 2000 6. Safety Report/QRA (Seveso II Directive) for the KRASSAS S.A LPG installation in Mesologgi. 2000 7. Hazard Identification (HAZID/HAZOP) study for the CHYMA S.A. Chemicals storage / handling installation in Lavrion Attica. 2000 8. Safety Report/QRA (Seveso II Directive) for the CHYMA S.A. Chemicals storage / handling installation in Lavrion Attica. 2000 9. Hazard Identification (HAZID/HAZOP) study for the proposed AEGEAN S.A. petroleum storage / handling station in KAVALA (including loading pipeline). 2001 10. Safety Report/QRA (Seveso II Directive) for the proposed AEGEAN S.A. petroleum storage / handling station in KAVALA (including loading pipeline). 2001 11. Hazard Identification (HAZID/HAZOP) study for the AEGEAN S.A. petroleum storage / handling station in ALEXANDROUPOLIS (including loading pipeline). 2001 12. Safety Report/QRA (Seveso II Directive) for the AEGEAN S.A. petroleum storage / handling station in ALEXANDROUPOLIS (including loading pipeline). 2001 13. Hazard Identification (HAZID/WHIF) study for the ZENECA/NOVARTIS S.A pesticide production / storage facility in Viotia. 2002 14. Safety Report/QRA (Seveso II Directive) for the ZENECA/NOVARTIS S.A pesticide production / storage facility in Viotia. 2002 15. Hazard Identification (HAZID/WHIF) study for the two ELVIEMEK S.A explosives production / storage facilities in Viotia (OINOFYTA & St. THOMAS) 2002 16. Safety Report/QRA (Seveso II Directive) for the two ELVIEMEK S.A explosives production / storage facilities in Viotia (OINOFYTA & St. THOMAS) 2002 17. Hazard Identification (HAZID/HAZOP) study for the EUROGAS S.A. LPG storage / bottling station in ALEXANDROUPOLIS (including loading pipeline). 2002 18. Safety Report/QRA (Seveso II Directive) for the EUROGAS S.A. LPG storage / bottling station in ALEXANDROUPOLIS (including loading pipeline). 2002 19. Hazard Identification (HAZID/WHIF) study for the YPSILON S.A. pesticide production / storage facility in Thessaloniki. 2005 20. Safety Report/QRA (Seveso II Directive) for the YPSILON S.A. pesticide production / storage facility in Thessaloniki. 2005 21. Hazard Identification (HAZID/HAZOP) study for the HERON THERMOELECTRIC S.A. NG Power Production plant in Theba. 2006 (HERON I & II Plants) 22. Safety Report/QRA (Seveso II Directive) for the HERON THERMOELECTRIC S.A. NG Power Production plant in Theba. 2006 (HERON I & II Plants) 23. Hazard Identification (HAZID/WHIF) study for the ARKAS S.A. explosives storage facilities in Kozani. 2008 24. Safety Report/QRA (Seveso II Directive) for the ARKAS S.A. explosives storage facilities in Kozani. 2008 25. Safety Studies for the EYDAP Psyttaleia Co-Generation Plants (Biogas-internal combustion & NG-Turbines) 2009 (with C&M S.A.) 26. Support to the General Secretariat of Public Protection (ΓΓΠΠ) for the SEVESO II directive implementation in Greece using the PHAST Software provided by DNV Software Ltd. 2009. 27. Hazard Identification (HAZID/WHIF) study for the MAXAM Hellas S.A. explosives storage facilities in Ioannina. 2011 28. Safety Report/QRA (Seveso II Directive) for the MAXAM Hellas S.A. explosives storage facilities in Ioannina. 2011 29. Safety Report/QRA (Seveso II Directive) for the new Combined Cycle Natural Gas Power Station “P.E.C POWERENERGY CYPRUS Ltd” in Cyprus. 2014 30. Hazard Identification (HAZID/WHIF) study for the MAXAM Hellas S.A. explosives production/storage facilities in Cherso Kilkis. 2014-2015 31. Safety Report/QRA (Seveso II Directive) for the MAXAM Hellas S.A. explosives production/storage facilities in Cherso Kilkis. 2014-2015 32. Hazard Identification (HAZID/WHIF) study for the ARKAS S.A. explosives storage facilities in Kozani. 2016 33. Safety Report/QRA (Seveso III Directive) for the ARKAS S.A. explosives storage facilities in Kozani. 2016 34. Hazard Identification (HAZID/HAZOP) studies for 8 Public Power Corporation (ΔΕΗ) Power Plants (2017) 35. Safety Reports/QRA (Seveso III Directive) for 8 Public Power Corporation (ΔΕΗ) Power Plants (2017) 36. Quantitative Risk Assessmet (QRA) study for the Interconnector Greece-Bulgaria N.G pipeline (IGB) with TAP in Komotini (2017) 37. Quantitative Risk Assessmet (QRA) study for the M/R Station for interconnection of Hellenic NGTS with TAP in Nea Messimvria including HAZOP/HAZID/ SIL studies (2018) (with C&M S.A.) 38. Quantitative Risk Assessmet (QRA) study for the inter-connection of the Interconnector Greece-Bulgaria N.G pipeline (IGB) with TAP in Komotini (2018) 39. ATEX study for the Pharmaceuticals production plant of SPECIFAR ABEE. in Attica (2018) 40. Risk Assesment Sudy of the Vassilikos Industrial Area in Cyprus (2019-with C&M S.A.) 41. HAZOP studies for the New Equipment Installation project in the Friesland Campina Pasteurized Milk production Plant in Patras (2019) 42. Seveso III Safety Study .ENGINEERING, PROCUREMENT AND CONSTRUCTION OF A NEW OIL PRODUCTS STORAGE PLANT (OPSP) AT VASSILIKO, CYPRUS (2019-with C&M S.A.) 43. sQRA Study .ENGINEERING, PROCUREMENT AND CONSTRUCTION OF A NEW OIL PRODUCTS STORAGE PLANT (OPSP) AT VASSILIKO, CYPRUS (2019-with C&M S.A.) 44. HAZID Report for FEED BOG Unit Revythoussa LNG Terminal (2019-2020 with C&M S.A.) 45. HAZOP Report for FEED BOG Unit Revythoussa LNG Terminal (2019-2020 with C&M S.A.) 46. SIL Report for FEED BOG Unit Revythoussa LNG Terminal (2019-2020with C&M S.A.) 47. Seveso III Safety Study for FEED BOG Unit Revythoussa LNG Terminal (2019-2020 with C&M S.A.) 48. Seveso III Safety Study for the EPS production plant of RAVAGO/MONOTEZ S.A. in Oinofyta (2019-2020). 49. SAFETY PHILOSOPHIE REPORT for BASIC AND DETAILED ENGINEERING DESIGN FOR SMALL SCALE LNG FOR DESFA. INFRASTRUCTURE AT THE PORTS OF PATRA , IGOUMENITSA AND HERAKLION (2020) FOR DESFA. 50. HAZID Reports for BASIC AND DETAILED ENGINEERING DESIGN FOR SMALL SCALE LNG INFRASTRUCTURE AT THE PORTS OF PATRA , IGOUMENITSA AND HERAKLION (2020) FOR DESFA. 51. HAZOP Reports for BASIC AND DETAILED ENGINEERING DESIGN FOR SMALL SCALE LNG INFRASTRUCTURE AT THE PORTS OF PATRA , IGOUMENITSA AND HERAKLION (2020) FOR DESFA. 52. SIL Reports for BASIC AND DETAILED ENGINEERING DESIGN FOR SMALL SCALE LNG INFRASTRUCTURE AT THE PORTS OF PATRA , IGOUMENITSA AND HERAKLION (2020) FOR DESFA. B. ENVIRONMENTAL IMPACT ASSESSMENT (E.I.A.) STUDIES (* = participation) 1. Environmental Impact Assessment Study of THESSALONIKI Airport “ΜΑΚΕΔΟΝΙΑ” (ΚΑΘΜ) and LIMNOS Airport (ΚΑΛΜ). 1993* 2. Environmental Impact Assessment Study of SERRES Airport 1993* 3. Environmental Impact Assessment Study of RODOS Airport “ΔΙΑΓΟΡΑΣ” (ΚΑΡΔ), KOS Airport (ΚΑΚΩ) and MYKONOS Airport (ΚΑΜΚ). 1993 * 4. Environmental Impact Assessment Study of MYTILINI Port. 1993 * 5. Environmental Impact Assessment Study of HERAKLION - CRETE Port. 1993 * 6. Environmental Impact Assessment Study of the future underground garage stations located at the KOLONAKI Square, EGYPTOU Square, KANIGGOS Square, KYPSELI Square and EFRANOROS Street - Athens 1994 * 7. ATHENS METRO Expansion Programme - Phase 1, 6. Environmental Impact assessment Study. 1994 * 8. Environmental Impact Assessment Study of CHIOS island Airport 1994 9. Final Study for the Protection, Deepening and Widening of the Korinth Canal. 1994 * 10. Environmental Impact Assesment Study for the underground garages of Rizari st. & Central Court in Athens. 1994 * 11. Environmental Impact Assesment Study for the Western Outer circular road of Thessaloniki and the Western Entrance road of Thessaloniki. 1994* 12. Environmental Impact Assesment Study for the new road through Thessaloniki. 1994 * 13. Environmental Impact Assesment Study for the new ring road of Thessaloniki Intersections K8-K9. 1996 * 14. Environmental Impact Assesment Study of the OMC Sepolia Depot during operation. 1994 * 15. Athens Metro. Lines 2 & 3. Environmental Impact Assesment Study for the construction and operation phases of the underground works, including CFD pollution dispersion model in urban canyons. 1994 * 16. Environmental Impact assessment Study of the new tunnel and associated roads connecting Preveza and Aktio. 1995 * 17. Environmental Impact Assessment Study of KAVALA Airport. 1995 * 18. Environmental Impact Assesment Study for the underground garage of the Central Music Autitorioum (MEGARO MOUSSIKIS) of Athens. 1995 * 19. Environmental Impact Assessment Study of TINOS island Port. 1995 * 20. Environmental Impact Assesment Study for the new road FERRES - KASTANIES. 1995 * 21. Environmental Impact Assesment Study for the new road to bypass SOUFLI. 1995 * 22. Environmental Impact Assessment Study of ZAKYNTHOS island Airport. 1995 * 23. Environmental Impact Assessment Study of PAROS island Airport. 1995* 24. Environmental Impact Assessment Study of SYROS island Airport. 1995* 25. Environmental Impact Assessment Study of SKYROS island Airport. 1995* 26. Environmental Impact Assessment Study of NAXOS island Airport. 1995* 27. Environmental Impact Assessment Study of IKARIA island Airport. 1995* 28. Environmental Impact Assessment Study of HERAKLION - CRETE Airporport 2nd Runway. 1995* 29. Assessment of the Study of sanitary landfill sites of Shistos, Attica. 1995 30. Environmental Impact Assessment Study of ASTYPALAIA island Airport. 1999. 31. Environmental Impact Assessment Study of KASTELORIZO island Airport. 1999. 32. Environmental Impact Assessment Study for the HALYPS CEMENT (Italcementi Group) plant in Aspropyrgos Attica. 2000 33. Environmental Impact Assessment Study for the new ALEXANDROUPOLIS port 1999* 34. Environmental Impact Assessment Study for the Wind Turbine Park in Zarakes, Evia island. 1999 35. Environmental Impact Assessment Study for the LAPAFARM pesticides plant in Mandra, Attica. 1997 36. Environmental Impact Assessment Study for the new SANTORINI port 1999 37. Environmental Impact Assessment Study for the new CRETA FARM plant in TRIKALA. 2000 38. Environmental Impact Assessment Study for the Olympic Construction Works in HELLENICON Attica. 2001* 39. Environmental Impact Assessment Study for the new Combined Cycle Natural Gas Power Station “HERON” in Viotia. 2001 40. Environmental Impact Assessment Study for the FANIS resin production plant in MEGARA Attica. 2001 41. Environmental Impact Assessment Study for the new Underground Parking in ALANA TOUMBA Thessaloniki. 2002 42. New Environmental Impact Assessment Study of CHIOS island Airport. 2002 43. Environmental Impact Assessment Study for the new OMIKRON Buliding in Gerakas, Attica. 2002.(with C&M S.A.) 44. Environmental Impact Assessment Study for the new CNG Bus refuelling Station in Anthoussa, Attica. 2002. (with C&M S.A.) 45. Environmental Impact Assessment Study for the new OLP Heliport in the port of PIRAEUS. 2002 46. Environmental Impact Assessment Study for the new 150/20 KV Transformers in the MOTOR OIL Refinery, Korinth. 2003 47. Environmental Impact Assessment Study for the SHELL HELLAS. petroleum storage / handling station in AMFILOHIA (including loading pipeline). 2004 48. Environmental Impact Assessment Study for the EUROGAS LPG storage / bottling station in ALEXANDROUPOLIS (including loading pipeline). 2004 49. Environmental Impact Assessment Study of the new Patra – Pyrgos –Tsakona road in Peloponnesus. Aug. 2005. 50. Environmental Impact Assessment Study of the new PHILIP MORRIS-PAPASTRATOS cigarette production plant in Aspropyrgos, Attica. Aug. 2005. (with C&M S.A.) 51. Environmental Impact Assessment Study of the new Fokianos – Kyparissi road in Peloponnesus. Jul. 2005. 52. Environmental Impact Assessment Study of the new OEK housing complex in KARDITSA. Jan. 2006. 53. Environmental Impact Assessment Study of the new TRADE LOGISTICS S.A. warehouse complex in OINOFITA. 2006. (with C&M S.A.) 54. Environmental Impact Assessment Study of the new KARAMOLENGOS S.A. installations in KOROPI. 2006. (with C&M S.A.) 55. Environmental Impact Assessment Study of the new ARCO BIOFUELS S.A. installations in Viotia. 2006. (with C&M S.A.) 56. Environmental Impact Assessment Study of the EUROPA S.A Aluminum Products production plants in Oinofita. 2008 57. VOC Emission Estimation & Reduction plan for MONOTEZ S.A installations in Oinofyta. 2008 58. Environmental Impact Assessment Study for the new Water Bottling plant “NATURA” in Stymfalia-Korinthos. 2009 59. Environmental Impact Assessment Study for the new WEEE Recycling plant “MEKANIKA” in Aspropyrgos-Attica. 2009 60. Environmental Impact Assessment Study for the new Open Cycle Cycle Natural Gas Power Station “AIGAION” in Ag. Theodoroi. 2009 61. Environmental Impact Assessment Study for the new DESFA pipeline from Ag. Theodori to Megalopolis, 2009. (Part of the FEED/EIA Study, with C&M S.A./Penspen Consortium) 62. Environmental Impact Assessment Study for the revision of the Environmental Permits for the “ASTAKOS Marine- Industrial Develompment Area” to include a 1.1 MWe LPG fired Power Plant, LPG & LNG storage facilities. (with C&M S.A.) 63. Environmental Impact Assessment Study for Axis 80 part of the EGNATIA Highway Ferres – Kastanies, 2010. 64. Environmental Impact Assessment Study for the Hellenic Aerospace Industry S.A. (EAB) complex in Tanagra, 2010-2011. 65. Environmental Impact Assessment Report Part II - N. Messimvria to Thesprotia - Preliminary Study for the South Stream Project in the Greek Territory, 2011. (with C&M S.A.) 66. Environmental Impact Assessment Report “Inerconnector Greece-Bulgaria Natural Gas Pipeline Project” in the Greek Territory, 2012-2013. (Part of the FEED/EIA Study, with C&M S.A./Penspen Consortium) 67. Environmental & Social Due Diligence of the “Inerconnector Greece-Bulgaria Natural Gas Pipeline Project” in the Greek Territory on behalf of the EBRD/ICGB. 2013-2014. 68. Environmental Impact Assessment Study of the VIOMETALE S.A Metal Finishing plants in Oinofita. 2014 69. Environmental Impact Assessment Study of the ALUMINCO S.A Aluminum Products production plants in Oinofita. 2014- 2015 70. Environmental Impact Assessment Study of the EUROPA S.A Aluminum Products production plants in Oinofita. 2014- 2015 71. Environmental Impact Assessment Study of the HOUMAS S.A Battery Recycling plant in Aspropyrgos. 2015 72. Environmental Impact Assessment Study of the TRANSCOMBI S.A. Logistics Centre In Oinofyta. (2017) 73. Environmental Impact Assessment Study of the VIOPATHE Logistics Centre In Igoumenitsa. (2017) 74. Environmental and Social Impact Assessment (ESIA) study for the M/R Station for interconnection of Hellenic NGTS with TAP in Nea Messimvria (2018) 75. Environmental Impact Assessment (EIA) study for the inter-connection of the Interconnector Greece-Bulgaria N.G pipeline (IGB) with TAP in Komotini (2018) (with C&M S.A.) 76. Environmental Impact Assessment (EIA) study for the EPS production plant of RAVAGO/MONOTEZ S.A. in Oinofyta (2019) 77. Environmental Impact Assessment (EIA) study for the BOG Unit Revythoussa LNG Terminal (2019-2020 with C&M S.A.) 78. Environmental Impact Assessment (EIA) study for the KYKLOS GROUP SA in Volos Industrial Region Athens Greece. (2019) 79. Environmental Impact Assessment (EIA) study for the EUROPA SA in Oinofyta Athens Greece. (2019-2020) 80. Environmental Impact Assessment (EIA) study for two circular crossroads in the Velo –Vocha county (2019-2020) 81. Environmental Impact Assessment (EIA) study for the TERNA S.A. Natural Gas Power Industry in Komotini Industrial Region Greece. (2019-2020) C. GENERAL ENVIRONMENTAL MANAGEMENT / GREEK MINISTRY OF THE ENVIRONMENT AND ENERGY CONSULTING 1. Co-Ordination and time-scheduling of the works related to the Development of an Operational Center for Atmospheric Pollution Prediction and Abatement in the Athens Area. Ministry of the Environment and Public Works. 1997 2. Study of the Implications of the application of the VOC (future) Directive, COM (96) 538 final 96/0276 (SYN) in Greece and prepation of a National VOC reduction plan. Ministry of the Environment and Public Works. 1998 3. Study of the pollution prevention and abatement technologies for the Hellenic Non Metallic Mineral Products Industries of paragraph 3, Appendix I of Directive 96/61/EC/24-9-96 about Integrated Pollution Prevention and Control (IPPC) and suggestions for the application of the Best Available Techniques. Ministry of the Environment and Public Works. 1998 4. Study of the pollution prevention and abatement technologies for the Hellenic Food Products Industries, Appendix I of Directive 96/61/EC/24-9-96 about Integrated Pollution Prevention and Control (IPPC) and suggestions for the application of the Best Available Techniques. Ministry of the Environment and Public Works. 2000 5. Compilation of a Large Scale Industrial Emissions Inventory for Greece. (SYBILLA in joint ventures with LDK S.A. - ENVECO S.A., - EPEM Ltd. and EXERGIA S.A.). Ministry of the Environment and Public Works. 2000 6. Compilation of a Emissions Inventory of road sea & air traffic for Greece. (participation) Ministry of the Environment and Public Works. 2001 7. Preparation of a Master Plan for the abatement of Air Pollution in Patras. (participation) Ministry of the Environment and Public Works. 2004 8. Preparation of a Standard for the Safety Management Systems in Argochemical Production & Handling plants according to the SEVESO II Directive. Ministry of the Environment and Public Works. (SYBILLA in joint ventures with EUROCONSULTANTS S.A) 2005 9. Development of a Master Plan for Air Pollution Prevention & Abatement in the greater Patras Area 2006 (with ADK Consulting engineers S.A.) 10. Development of a Strategic Environmental Impact Assessment Study for the greater West Macedonia Region 2007. D. SOIL POLLUTION / REMEDIATION STUDIES 1. Pollution Assessment and Remediation Plan Development for the Schinias Park in Marathon, Attica (2005) 2. Pollution Assessment and Remediation Plan Development for the Thoricos Beach in Lavrion, Attica (2006) 3. Pollution Assessment and Remediation Plan Development for the HALYVOUGIKI S.A. hazardous solid waste storage area in Elefsina, Attica (2008) 4. Pollution Assessment and Remediation Plan Development for the HALYVOUGIKI S.A. non hazardous solid waste storage area in Elefsina, Attica (2008) 5. Pollution Assessment and Remediation Plan Development for the MOTOR OIL HELLAS non hazardous solid waste treatment (landfarming) area in Ag. Theodori (2009) 6. Pollution Assessment and Remediation Plan Development for the VIOMETALE metal finishing plant polluted area in Oinofyta (2013). Remediation Plan approved, implemented and concluded in 2015. 7. Pollution Assessment Study of the ALUMINCO S.A Aluminum Products production plants in Oinofita. 2015 8. Pollution Assessment Study of the EUROPA S.A Aluminum Products production plants in Oinofita. 2015 9. Pollution Assessment Study of the HOUMAS S.A Battery Recycling plant in Aspropyrgos. 2016 10. Pollution Assessment Study for 14 Hellenic Airports (Thessaloniki, Rhodes, Chania, Corfu, Mykonos, Mytilene, Kos, Aktio, Kavala, Skiathos, Kefalonia, Zakynthos, Santorini, Samos) - (2017-2018) E. INDUSTRIAL / CFD / ENERGY SECTOR STUDIES 1. Air Flow prediction in an urban configuration (SYBILLA Ltd for CRES - May '96) 2. Simulation & study of a rotating cement kiln (SYBILLA Ltd for EKET - Jun '97) 3. Air Flow and temperature distribution prediction in an urban configuration (SYBILLA Ltd for CRES - Dec '99) 4. Air Pollutant Dispersion Studies for various proposed installation sites for new NG & Coal power plants “HERON THERMOELECTRIC S.A.” 2009 5. Thermal Plume Dispersion Prediction Stydy for the Proposed SOVEL S.A. 600MWe power Plant in Almyros, Volos Area 2009. (with ADK Consulting Engineers S.A.) F. MUNICIPAL & INDUSTRIAL WASTEWATER TREATMENT PLANT STUDIES 1. Industrial WWTP of the West Hellinikon Airport. - Jun '97 2. WWTP of Psyttaleia - Secondary clarifier (study included in bid) - Apr. '97 3. Industrial WWTP for the BIPE of Komotini (study included in bid) - Mar. '98 4. Industrial WWTP for the for the new CRETA FARM plant in TRIKALA. 2000 5. Wastewater treatment plant of Gevgelija. Update of existing study & Preparation of Tender Documents. FYROM. 6. Industrial Wastewater treatment plant of Heraklion, Crete BIPE. Tertiary Treatment System Design 2005. 7. Monitoring & Inspection of the MOTOR OIL (HELLAS) Industrial Wastewater treatment plant 2006 8. Study for the disposal of wastewater from 3phase olive oil Production plants for ELAIOYRGIKI S.A. 2006 9. Municipal WWTP for the for the new Housing Development Project in Puntazeza Attica. 2007. 10. Industrial Wastewater treatment plant of the proposed NG combined cycle power plant of HALYVOURGIKI S.A. in Elefsina, Attica. 2007. 11. Industrial Wastewater treatment plant of EUROPA S.A, Oinofita. 2008 12. HELLENIC AEROSPACE INDUSTRY INSTALLATIONS, LIQUID WASTE PROCESSING AND DISPOSAL STUDY ACCORDING TO GOVERNMENT GAZZETE 749/Β/31-05-2010/#20448 TO REACH MINIMUM POLLUTANT VALUES. 13. WASTE INSTALLATION CONSTRUCTION AND MAIN SEWER PIPELINES OF SERVIA AND PLATANOREMA, KOZANI. LIQUID WASTE PROCESSING AND DISPOSAL STUDY. 14. Consultancy Services to the Greek Ministry of Infrastructure for the Upgrade of the Central WWTP of Athens on the Psyttaleia Island. 2012. 1 5 . MEGAS ALEKSANDROS PELLA WASTEWATER PROCESSING INSTALLATION, TECHNICAL STUDY OFFER (2014). 1 6 . LEONIDION, ARKADIA WASTEWATER PROCESSING INSTALLATION, TECHNICAL STUDY OFFER (2015) G. MUNICIPAL SOLID WASTE DISPOSAL SITES SELECTION & DEVELOPMENT 1. Initial Design and Environmental Impact Assessment Study for the new Sanitary Landfill in Korakia CRETE island. (study included in bid) 2001 2. Initial Design and Environmental Impact Assessment Study for the new Sanitary Landfill in Amari, CRETE island. (study included in bid) 2002 3. Initial Design and Environmental Impact Assessment Study for the new Sanitary Landfill in KOZANI-PTOLEMAIS. (study included in bid) 2002 4. Initial Design and Environmental Impact Assessment Study for the new Sanitary Landfill in SAMOS island. (study included in bid) 2005 5. Initial Design and Environmental Impact Assessment Study for the new Sanitary Landfill in FYLI, Attica. (study included in bid) 2005 6. Initial Design and Environmental Impact Assessment Study for the new Sanitary Landfill in GRAMMATIKO, Attica. (study included in bid) 2005 7. Regional Plan for Solid waste management in the Ionian Islands Region. 2007 8. Regional Plan for Solid waste management (revision) in the Thessaly Region. 2008 9. Assessment Inventory Studies for Urban and Industrial Solid Wastes in Viotia-Greece ( INTRAKAT S.A) 2008. 10. Design of a Municipal Solid Waste pre-processing plant, Heraklion Crete. 2008, study included in bid. 1 1 . Design of a Municipal Wastewater Sludge Drying Plant for the Thessaloniki WWTP (Ch. Konstadinides S.A Constructor Design Study.) 2009. 12. Solid Waste Treatment Unit (MEA) for the Serres Region of Central Macedonia ( ΣΙΡΡΑ ΑΕ- Constructor Design Study 2016-2017) PPP Project 13. Solid Waste Treatment Unit (MEA) for 2 nd Region of Viotia ( Intrakat-WATT- Constructor Design Study 2018-2019) 14. Design Solid Waste Treatment Unit – Landfill for AMARI CRETE (2018-2019 study included in bid) H. ENVIRONMENTAL MANAGEMENT SYSTEMS DEVELOPMENT 1. Development of An Integrated Quality / Environmental / Safety Management System according to the ISO 9001/ISO 14001 standard and the SEVESO II Directive for ALPHA Agrochemicals S.A. 2005 2. Development of Environmental Management System according to the ISO 14001 standard for REVOIL ΑΕΕΠ. 2002 3. Development of Environmental Management System according to the ISO 14001 standard for HALYPS CEMENT (Italcementi Group). 2002 4. Development of Environmental Management System according to the ISO 14001 standard for ΦΑΝΗΣ ΑΕ 2004 5. Development of Environmental Management System according to the ISO 14001 standard for ΙΟΝ Α.Ε. 2004 6. Development of Environmental Management System according to the ISO 14001 standard for INOVA Α.Ε. 2004 7. Development of Environmental Management System according to the ISO 14001 standard for BERLING Α.Ε. 2004 8. Development of Environmental Management System according to the ISO 14001 standard for INTERNATIOL HΛΙΟΣ COTACHEM ΑΕΒΕ. 2005 9. Development of Environmental Management System according to the ISO 14001 standard for ΜΠΗΤΡΟΣ ΜΕΤΑΛΛΕΥΤΙΚΗ ΑΕΒΕ 2005 10. Development of Environmental Management System according to the ISO 14001 standard for ΕΠΑΛΜΕ Α.Ε. 2005 11. Revision of the Environmental Management System according to the ISO 14001 standard for ΧΑΛΚΟΡ Α.Ε. 2009 I. CLIMATIC CHANGE ADAPTATION STUDIES 1. Development of a Climatic Change Adaptation Programme for Thessaly Greece (2019-2020) 2. Development of a Strategic Environmental Impact Assessment Study (SEA) for the Climatic Change Adaptation Programme for Thessaly Greece (2019-2020).